Install two bearing cups in one procedure on virtually all medium and light-duty u-joints.
Manufactured from high-grade steel for strength and durability. Simple to use for instant results.
An encased magnet is utilized for installation, retaining the new bearing cup in place over the yoke assembly opposite the forcing screw. Once this assembly is secured, a second bearing cup is positioned for installation by means of the plunger found at the end of the forcing screw. An impact or hand wrench is applied to the forcing screw, securing the first bearing cup in place and allowing installation of the first retaining clip. The u-joint is then rotated and the process repeated, effectively installing both bearing cups.